Reference Schedule of design documentation deliveries prepared by Hydrocoop Ltd. in the field of sewerage networks

The list includes finished significant ptroject documentation (PD) of greater extend.

Title of the PD, level, description Employer Informative capital costs
Veľké Úľany – vacuum sewerage system:PD for realization, 20,400 m of vacuum mains, 1 pumping station, 1,716 m of pressure mains of pressure sewerage system Vodné stavby Ltd. Bratislava
5,277,830.-
Wastewater collection of the region Šaľa: PD for construction permit, sewer systems in 7 villages, 210 pumping stations, 16,400 m of pressure lines, 68,000 m of gravity sewers Waterworks of West Slovakia.
28,214,830.-
Wastewater collection and treatment in the town Martin and the region Dolný Turiec: PD for zoning and planning decision and for construction permit , sewerage systems in 8 villages, 10 pumping stations, 12,000 m of pressure lines, 62,000 m of gravity sewers Waterworks of North Slovakia
17,260,840.-
Wastewater collection and treatment in the town Martin and the region Dolný Turiec: PD for realization, sewer systems in 8 villages, 10 pumping stations, 12,000 m of pressure mains, 62,000 m of gravity sewers Waterworks of North Slovakia 17,260,840.-
Basin of Váh and Danube – agglomeration Galanta – wastewater collection and treatment + drinking water supply: PD for zoning and planning decision, sewer systems in 17 villages, 283 pumping stations, 35,257 m of pressure mains, 85,312 m of gravity sewers Waterworks of West Slovakia Nitra
34,806,000.- 
Basin of Váh and Danube –agglomeration Šamorín – Wastewater collection and treatment + drinking water supply system: PD for zoning and planning decision, sewer systems in 15 villages, 73 pumping stations, 25,300 m of pressure mains, 88,320 m of gravity sewers Waterworks of West Slovakia Nitra
28,038,000.-
Vajnory – vacuum sewerage:PD for construction permit and realization, 12,350 m vacuum mains, 1 pumping station, 1,150 m of discharge mains of pressure sewerage AQUAstav Bratislava   3,990,000.-
Region Senec – technical-economical assessment of variant possibilities, wastewater collection and treatment: feasibility study Waterworks of Bratislava
13,795,400.-
Region of Malé Karpaty – sewerage system, Main delivery piping, from Modra in the central WWTP Bratislava – Vrakuňa - pressure main DN 300 to DN 600:, PD for zoning and planning decision and for construction permit PD for realization, 25.3 km of pressure pipeline, 5 main pumping stations, 20 local pumping stations Waterworks of Bratislava *29,315,000.- (altogether
Region of Malé Karpaty – sewerage system, Reconstruction of sewer networks in the towns Modra, Pezinok and Svätý Jur: PD for realization, reconstruction of 10.4 km of sewers, reconstruction of 3 WWTPs Waterworks of Bratislava       *
Bratislava – Rača – reconstruction of the main sewer „FR“: PD for construction permit and realization, 5.1 km of combined system network Waterworks of Bratislava 5,804,650.-
Wastewater collection and treatment in the region of Horný Liptov – Hybe, Východná, Važec: feasibility study and PD for zoning and planning decision, 30.3 km of foul water sewers, 14 pumping stations, 3.16 km of discharge main Waterworks of North Slovakia
9,835,420.-
Water supply, wastewater collection and treatment in the region Dolné Kysuce:  PD for zoning and planning decision and construction permit, sewer systems in 14 villages, 45 pumping stations, 14 km of pressure mains, 105 km of gravity sewers Waterworks of North Slovakia 12,921,000.-
(incl. the water supply)
Wastewater collection and treatment in the town Turčianske Teplice and in the region Horný Turiec: PD for zoning and planning decision and for construction permit
32.6 km of gravity sewers, 2.6 km of discharge piping, 5 pumping stations, reconstruction of a WWTP for 15.835 PT.                                     
Waterworks of Turiec 8,022,940.-
Spišská Belá – environmental infrastructure: PD for zoning and planning decision and for construction permit
6.0 km of foul water sewers, 1.7 km of discharge piping, 14.0 km of storm water sewers, 4 pumping stations, 3.1 km of river regulation.
The town Spišská Belá
11,315,140.-
Agglomeration Tlmače - wastewater collection and treatment - region of Tekov II., system № 2 Tekovské Nemce – Čaradice:  PD for construction permit and for realization, 10.5 km of gravity sewers, 4.1 km of discharge piping, 15 pumping stations, WWTP for 1,705 PT. The village Tekovské Nemce 
3,094,040.-
Sewerage of the Trnava Region – part 1, sewer network: PD for realization and assistance in implementation, 101,000 m of gravity sewer network,65,000 m of pressure sewerage, 58 pumping stations  Water management   constructions Bratislava     39,204,674.-
Wastewater sewerage system in the villages of eastern part of the Komárno Region, part 1 – Construction № 1 Iža, Construction № 2 Marcelová, Construction № 3 Virt, Construction № 5 Moča: surveys,feasibility study and PD for construction permit, 42,000 m of gravity sewers 20,000 m of pressure sewers, 23 pumping stations, 1,475 m of gravity house connections 960 m of pressure house connections  Association of villages on behalf of the village Moča 10,680,000.-
Partizánska Ľupča – sewerage and WWTP: PD for zoning and planning decision and for construction permit, 6,727 m of foul water sewers, 1,384 m of pressure mains, 4 pumping stations, house connections The village Partizánska Ľupča 1,925,000.-
Basin of Váh and Danube, agglomeration Galanta – Wastewater collection and treatment: PD for zoning and planning decision and for construction permit
Sewerage system of the 7 villages          
Association Agglomeration Galanta ZIPP Bratislava 13,000,000.-
Wastewater collection and treatment in the region Horný Liptov – Hybe, Východná, Važec: PD for realization, 30,300 m of foul water sewer network, 14 pumping stations Waterworks of North Slovakia 10,220,000.-
Region Senec – sewerage: feasibility study, construction project, PD for zoning and planning decision and for construction permit Waterworks of Bratislava 1,097,964.-
Sewerage system of the Danube-near part of the Bratislava Region – Sewer network of Podunajské Biskupice: PD for zoning and planning decision, for construction permit and for realization, 18,632 m of gravity sewers - Waterworks of North Slovakia 9,826,000.-
Sewerage system of the Danube-near part of the Bratislava Region – Sewer network of Prievoz: PD for zoning and planning decision, for construction permit and for realization, 5,280 m of gravity sewers, 1 pumping station, 556 m of pressure main Waterworks of North Slovakia 2,798,670.-
Slovenská Ľupča – foul water sewerage and WWTP: PD for construction permit and for realization, 12,610 m of gravity sewers, 3 pumping stations, 654 house connections Municipal Office Slovenská Ľupča 2,123,000.-
Čierny Balog – Sewerage and WWTP: Surveys, construction project, PD for construction permit and for realization, 28,000 m of gravity sewers, 650 m of pressure sewers, 10 pumping stations, gravity/pressure house connections Municipal Office Čierny Balog 2,200,000.-
Kolárovo – Wastewater collection: PD for construction permit and for realization, 20,964 m of gravity sewers DN 300, 2,037 m of gravity sewers DN 400, 6,188 m of pressure lines DN 50 ÷DN 150, 36 pumping stations, 1,830 m of reconstruction of sewers DN 700, DN 800, DN 1000 and DN 1200 by trenchless technology Waterworks of West Slovakia Nitra
1,980,000.-
Sereď – Completion of the sewer network: PD for construction permit, 3,266 m of gravity sewers DN 300, 665 m of gravity sewers DN 400, 3,096 m of pressure lines DN 80, 5 pumping stations Waterworks of West Slovakia Nitra
1,750,000.-
Village-wide sewer system and WWTP of the village Častá: PD for zoning and planning decision and for construction permit, 7,200 m of foul water sewer system, 990 m of pressure lines, 3 pumping stations, house connections, WWTP for 2,500 PT The village Častá 1,826,000.-
Public sewerage system for Žitavany: PD for construction permit, 8,134 m of gravity sewers, 1,408 m of pressure lines, 3 pumping stations Waterworks of West Slovakia   4,088,800.-
Zlaté Moravce – Sewerage system completion: PD for construction permit, 4,782 m of gravity sewers, 1,767 m of pressure lines, 5 pumping stations Waterworks of West Slovakia 2,849,600.-
Rybník – Sewerage system completion: PD for construction permit, 6,933 m of gravity sewers, 2 pumping stations, 28, m of pressure lines Waterworks of West Slovakia 2,829,000.-
Tlmače – Sewerage system completion: PD for construction permit, 2,886 m of gravity sewers, 1,051 m of pressure lines, 4 pumping stations Waterworks of West Slovakia 2,849,600.-
Sewerage systems in the villages of lower Žitný ostrov – Construction № 1 – Zemianska Olča, Construction № 2 – Okoličná na Ostrove, Construction № 5 – Trávnik, Construction № 6 – Zlatná na Ostrove and Construction № 7 – Čalovec: surveys, feasibility study, PD for zoning and planning decision and for construction permit, engineering activity, 72,000 m of gravity sewers, 14,000 m of pressure sewers, 44 pumping stations, 3,170 m of gravity house connections, 1,000 pressure house connections Municipal Offices 14,137,000.-