Title of the PD: level of the documentation, description | Employer | Informative capital costs
€ |
---|---|---|
Gajary – Water supply system 2nd stage:
PD for construction permit, 6,000 m of distribution mains and house connection branches DN 150 and DN 100 | Municipal Office Gajary
| 728,000.- |
Group water supply system Senica – Feeder pipeline „B“ for the villages Kuklov, Borský Svätý Jur, Sekule and Moravský Svätý Ján:
PD for construction permit and for realization | Waterworks of Bratislava.
| 1,892,050.- |
Basin of Váh and Danube, agglomeration Galanta – Wastewater collection and treatment + Drinking water supply system –
Preliminary project, 4,799 m of water mains, water tanks 1 x 1,200 m3 and 2 x 3,000 m3 | Waterworks of West Slovakia | 1,991,600.- |
Basin of Váh and Danube, agglomeration Šamorín – Wastewater collection and treatment + drinking water supply system,
Preliminary project, 50,171 m of water mains, water tanks | Waterworks of West Slovakia
| 5,924,220.- |
Object of water supply system – group water supply system Gabčíkovo – Water source extension in the locality „A“:
Project within the Cohesion Fund, water source extension by 6 wells, increase of pumping station capacity by Q = 500 l/s | Waterworks of West Slovakia
| 8,911,240.- |
Water supply system, Wastewater collection and treatment in the region Dolné Kysuce:
PD for zoning and for construction permit 7,930 m of feeder lines, 1,580 m of inlet line to the water tank, 2,184 m of water distribution lines, 1 lifting station | Waterworks of North Slovakia..
| 62,921,000.-
incl. the sewerage syst. |
Spišská Belá – Environmental infrastructure:
PD for zoning, for construction permit and for realization 4,464 m of feeder lines, 932 m of water distribution lines | The town Spišská Belá, | 11,315,340.- |
Chorvátsky Grob – Čierna voda, Feeder piping Rybničná – Šúr channel:
PD for zoning and planning decision and for realization 2,080 m of piping DN 400 | The village Chorvátsky Grob | 858,000.- |
Viničné – Water supply system reconstruction:
PD for zoning and planning decision and for construction permit, 1,285 m of DN 150, 668 m of DN 100, 130 m of house connection branches | Waterworks of Bratislava | 768,515.- |
Modra – Vajnorská street – Water mains reconstruction:
PD for construction permit and for realization, 463,8 m of supply lines DN 100, 18 pcs of house connection branches | Waterworks of Bratislava | 185,440.- |
Reconstruction of technological and electro-technological part ofthe PS Trstená na Ostrove:
PD for construction permit and for realization, exchange of pumps, structural adjustments in the PS | Waterworks of West Slovakia | 46,120.- |
The region Želiezovce – Drinking water supply system:
PD for construction permit, 24,135 m of feeder lines, 17,959 m of supply lines, 15,965 m of distribution mains, water tanks 2 x 4,500 m3, 2 x 400 m3 | Waterworks of West Slovakia | 15,650,000.- |